All
- All
- Current Projects
- Completed Projects
Sg. Teriang (Tunnel)
Hulu Langat (Twin Tunnel with water chamber)
Tunnel rehabilitation work for TNB (Pergau, Woh intake, Kenyir Dam, Hulu Terangganu)
Drilling and control blasting for Nenggir Dam and Saddle Dam works. (Gua Musang)
Rock blasting and pad footing. (Geohan)