Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

News and Events


Indra Gandhi International Airport (IGIA) - Construction of Terminal 3
AGL Ducting & Handholes at Runaway / Taxi way Honeywell Airport Systems GmbH

Circle Line Stage 3 - Including Stabilization Works at Cross Passages
Rock Blasting & Slope Stabilization works at Cross Passage (CCl 854)

New Doha International Airport (NDIA)
Sinohydro-Gamuda-WCT JV

CURRENT AWARDED PROJECTS

Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh - Kajang Underground Works Package
Construction and Completion of
Rock Blasting Work at Pasar Rakyat
Station
IDE - TOTALAP Joint Venture

Ulu Jelai Hydroelectric Project
Tunnel Excavation and Support
Measures for HR Maintenance, Telom
and ECV Tunnel.
Salini Malaysia

Excavation of lots 103,144,275,276 & 277 and Part of Lot 143,Daerah Seberang Prai Selatan,Pinang
Quarry Blasting Works
M.D.R.Bina (M) Sdn Bhd

Slope Protection Works
2013
Soil Nailing Works
Soil Mechanic Sdn.Bhd.

Monorails WIFI Project
2012
Installation of CCTV
PSI Incontrol Sdn.Bhd.

VALE Malaysia Manufacturing Project (VMMP)- Phase
1A(Stage 1) For Earthworks Services
Rock Blasting And Slope
Protection Works
WCT Construction Sdn. Bhd.

UluJelai Hydroelectric Project
Portal Works And Tunnel
Excavation
Salini (Malaysia) Sdn. Bhd.

Electrified Double Track Project-Ipoh To Padang Besar
Shotcrete Wall For
Contiguous Bored
Pile (CBO) At Ch
6730 To Ch 6940
- N4/S15
MMC - GAMUDA JOINT
VENTURE

Electrified Double Track Project-Ipoh To Padang Besar
Slope Protection Works CH30000 to
CH30250 (N4/S12
MMC - GAMUDA JOINT VENTURE

ElectrifiedDouble Track Project-Ipoh To Padang Besar
Soil Nail Wall with
Grid Beam at CH28350
to CH28450 - N4/S12
MMC – GAMUDA JOINT
VENTURE

Cadangan Pembangunan Sebuah Blok Pejabat 14 Tingkat,
DamansaraPerdana, Selangor
Shotcreting and Rock Bolting Works
Kumpulan CLO BersekutuSdn. Bhd.

VALE Malaysia Manufacturing Project(VMMP) - Phase 1A (Stage 1) For Earthworks Servicess. Manjung
WCT Construction Sdn. Bhd.

Ulu Jelai Hydroelectric Project
Portal Works and Tunnel Excavation
Salini (Malaysia) Sdn. Bhd.

Electrified Double Track Project-Ipoh To Padang Besar
Shotcrete Wall for Contiguous
MMC-G amuda Joint Venture

Electrified Double Track Project-Ipoh To Padang Besar
Slope Protection Works
MMC-G amuda Joint Venture

Electrified Double Track Project-Ipoh To Padang Besar
Soil Nail Wall With Grid Beam
MMC-G amuda Joint Venture

CERTIFICATES

1. Company Registration


2. ISO,CIDB Certificates


3. Shot Firer Certificates


4. Credential Certificates


  Home | Contact Us | Saftey Policy
Copyright @ 2011 Protext Construction